Posted in Uncategorized

New Career at Galfar Engineering


At HSE induction of GALFAR.

My first job abroad very much excited for this opportunity with Galfar Engineering & Contracting SAOG which is one of the largest, multi-disciplined engineering, contracting and construction company in the Sultanate of Oman. Established in the year 1972 it came a long way.
I am appointed as a QC Engineer here still, I am not assigned to any Project it’s being a week here in the head office and every day we are attending awesome training on different topics.
And by the way, Muscat is beautiful.

Posted in Uncategorized

Flying to Muscat


See u in Muscat….

Muscat is situated on the Gulf of Oman at the south part of Al Batinah coast. It is confined to the theirGulf of Oman and the mountains of AI Hajr Al Sharyi can’t wait to reach there.

Posted in Uncategorized

Pizza…..

Barbecue chicken pizza Dominos….yummy my favorite pizza
Today it’s a day off for me, I wake late missed breakfast and lunch too and I am really hungry thanks to dominos delivery they saved my lazy day.

The Delivery was fast and the pizza is still hot, I find some extra Oregano Seasoning and Chilli flake sachet too I don’t like Chilli though once again thank’s to dominos for killing my hunger with yumminess.

Posted in Uncategorized

Grout Plant

Grout Plant for TBM 1 and 2 at Launching Chamber of New Delhi Metro ready to blend.

As the Herrenknecht TBM uses annular grouting system with two-component grout through-the-tailskin. This grout plant errection was at top priority.

So this grout batching system incorporates two storage silos, a colloidal mixer, agitation tank, water delivery system, two high pressure Mocol hydraulic pumps and a sodium silicate delivery system.

The colloidal mixer serves as a mixer, scale and pump, weighing water and cement directly. Bentonite, as a ‘micro-ingredient’ is per-weighed in a smaller weigh hopper at top of the container. Liquid admix is dosed into the mixer.

Grout is stored in the agitation tank and pumped to holding tanks on the TBM backup when needed.

Posted in Uncategorized

Mat fixing for Shotcrete

Wire Mesh Fixing for Shotcrete at Launching chamber of New Delhi Metro…

PURPOSE

To ensure rock slope/ opening stability. It acts as reinforcement for the shotcrete.

MATERIAL SPECIFICATION

Steel wire shall be of strength grade Fe 500 according to IS 1786. The dimension
of the steel wire shall be  The steel wire mesh shall be
delivered to the site in flat mats or pre-bent to the specified shape.

INSTALLATION PROCEDURE

The steel wire mesh shall be installed such that it follows as closely as
possible the irregularities of the excavation surface or previous layers of shotcrete.
Steel wire mesh shall be fixed by nailing to the rock surface. it shall be firmly fixed to prevent vibration and change of position during spraying of shotcrete. The steel wire mesh shall be installed in the longest practical length.The overlap of the steel wire meshes applied in the shotcrete lining shall be at least twice the pitch distance in circumferential and one longitude direction.
The wire mesh will be installed so that minimum laps are to be provided for one circumferential layer.

Posted in Uncategorized

Happy New Year….


AMEL C1 New year Party….(Wish you all Happy New Year)
Saying Bye to 2008 it was a great year thanks to God, and God bless the year 2009 to bring more good lucks.

Seems a great beginning of the year 2009, fantastic weather, delicious food, awesome place, relaxing music all in company with best buddies…