Soil anchor drilling work is in highlight these days, soil anchoring is required to secure the retaining wall in position against the lateral pressure of earth during excavation and construction period and to prevent displacement of the retaining wall causing damage to buildings and utility at the side of the cut.

The sequence of the work till locking is as follows.

Drilling of boreholes for installation of the anchor.Fabrication of removable anchor at the site.
Installation of fabricated anchor tendon.
Grouting of removable tendons.
Fixing of anchor bracket, water, and bearing plate.
Installation of anchor head and jack.
Stressing the anchor & locking the anchor at specified workload.

Advertisements

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.