During the inspection, it was observed electrical conduits are installed directly above the form-work ply and not between the two layers of reinforcement this needs a quick fixture to proceed with casting.
Electrical conduit cover to concrete is not proper.
Cover to the electrical conduit is not proper
Cover to the electrical conduit is not proper.