
Dome form-work for lobby room, the construction of the centering for domes is more complicated than that of most other types of vaults. Formwork could be two way either horizontal or Radial we have a smaller dome and radial formwork will be easier for us in the picture we are making the mainframe with 21mm wooden ply, which will support two layers of ply sheet which are flexible enough to do the maths.
Dome form-work in place, reinforcement work in progress, Once reinforcement work completed a low slump concrete will be used for the casting.