Rajan Patel

5799 POSTS
5 comments

Beautiful Morning

Its a beautiful morning of-course its Delhi winter a cloudy morning, can feel the lovely breeze.what a great start for the...

Rock Bolting

Rock Bolting at launching chamber of New Delhi metro station. Rock bolts are used for the support of underground and surface...

TBM II

TBM 2 erection started at Launching chamber of New Delhi Metro, TBM-2 will start excavation on New Delhi to Shivaji...

Temporary Decking

Temporary Decking ready for operating at Station Area.This temporary decking really comes in handy in cut & cover construction this...

TBM Launching

Finally, the day arrived Mr. E.Sreedharan switching on the TBM. Feeling awesome to be a part of the celebration.In our scope,...

Soil Anchor Locking…

Drilling of ground anchor completed, HT tendon installation checked.Grouting strength checked.Now its time for stressing and locking of tendons, we...

Shotcrete Trial

Today we did a trial for Shotcrete, we will be doing shotcrete in launching chamber, in cut and cover areas & in...

Grouting Plant for Soil Anchor

Soil Anchor grouting plant arrived today at the site, grout plant consists of mixer, agitator, water measurement tank, storage water...

Kingpost Pile

Driving king post piles these days, well not many to drive still happy to part of this project lots of new...

Soil Anchor Drilling…

Soil anchor drilling work is in highlight these days, soil anchoring is required to secure the retaining wall in position...

2nd Layer strut fixing

Excavation work is in full swing we are almost ready for the second layer of strut fixing.The strutting system in the...

Preparing for Pile casting

Tonight we are casting a pile, tremie pipe lifting in progress for the casting. Once the tremie pipe will be...

Diaphragm wall cage lowering.

Its almost April, For two weeks I am in night shift and the temperature is better in the night. These days we are doing...

Viscosity of Bentonite

We are using Bentonite Slurry as Soil Stabilizing liquid, We have to check the viscosity to determine whether the slurry is...

Solder Pile

This day's pre-bored solider piles work is in progress at my site for the cut and cover and launching chamber...

Rig

Took a new assignment as a QC Engineer for Alpine-Samsung-HCC Joint Venture for their Under Ground Metro Project, This project is...