Rajan Patel

2266 POSTS
5 comments

In Search for Budget Furniture in Delhi.

I was thinking India is cheap in short-term use furniture but when I search over net and saw in mall there...

Mayfair Lagoon Bhubaneswer.

At Mayfair Lagoon Bhubaneswer.One of the best hotel to stay in Bhubaneswar. A five-star property is beautifully done upon the theme...

Check-In to Swosti Plaza Bhubaneswer.

Well to our luck Ginger Bhubaneswar was full so we went to Swosti, if I compare with our previous stay in...

Unboxing my Samsung Galaxy Note….

At Muscat city center mall....Home center the best place to buy electronic in muscat...Samsung has managed to fit the Galaxy Note...

Finding Non-Conformance in Plastering Inspection

As a QC Engineer duringĀ  Plastering inspection, I did observe following points that I will escalate to site team for their...

Bandar al Rowdha Marina

The Marina is located between the warm blue waters of the Gulf of Oman and the craggy Hajar Mountains...

Concrete at Cavity Wall

Cavity wall insulation is used to reduce heat loss through a cavity wall by filling the airspace with a porous material.This...

Al Bustan beach, Muscat

Some beautiful views of Al Bustan beach from my site photos are taken from a different elevation from mean sea level....

Water proofing membrane laying

Application of Polyprime.

Block Work Quality

As a QC Engineer during site visit I do observed these kind of non-conformance many time the root cause analysis is...

Block Work

As a QC engineer during the site visit following Non-Conformance observed in block work and issued to the site team now...

Prior to Backfilling

Back-filling around the structure is going to start, as a QC Engineer I will send the following comments to site...

Surface Preparation

Why site engineer's don't include surface preparation in their activity?Preparation for Light weight concrete work is going on in checklist...

Muscat Rain

Heavy rain in muscat..never seen muscat like this....its terrific ...

How important is Surface Preparation before concrete footing.

Non-Conformance in work due to Proper compaction not done for Footing PCC.Footing and ground structure are designed for ground with an...

Dome form work

Dome form-work for lobby room, the construction of the centering for domes is more complicated than that of most other types...